Skip to main content
Side panel
Learn | Air District
You are currently using guest access (
Log in
)
Online Asbestos Notification System
Home
Courses
Asbestos Training
Asbestos Notification System
V. Troubleshooting
Asbestos Notification System FAQ
Browse by category
Asbestos Notification System FAQ
Printer-friendly version
Search full text
Browse by alphabet
Browse by category
All categories
Categories
All categories
Not categorized
Account Creation & Management
BAAQMD
Fees & Payment
General
Homeowner
Inspection
Notification
NOV
Revisions
Survey
Withdrawals
Page: (
Previous
)
1
2
3
4
(
Next
)
NOTIFICATION
If my asbestos removal includes linear and square feet, can I enter the higher of those two amounts?
If there is a unit in the back of a single-family dwelling, what is my building type?
Is concrete or cement a suspect material?
Is there a way to save repetitive typing of the same information over and over again, like my contractor company and waste transporter information?
I’m a general contractor. Can I apply for a J#?
My home or residential building has multiple units. What is my building type?
My J# is about to expire. Do I need to apply for a new J#?
My next removal amount is less than the reportable amount (e.g. 70 sq.ft.), but I need to notify since I will exceed 100 sq.ft. of RACM within the past 12 months. What should I do?
The system says the address I entered is incorrect?
What file types can I upload with my Planned Renovation or Government-Ordered Demolition Notification?
What is a cumulative Renovation?
What is a Government-Ordered (Emergency) Demolition? Do I qualify?
What is a Planned Renovation?
What Total Removal Amount should I put for a Cumulative Renovation?
What’s the difference between square feet and linear feet?
When do I have to notify the District for floor mastic removal?
Why do I see the same contacts listed multiple times in the Contacts picker?
NOV
How do I pay for my ticket (NOV)?
What is a Notice of Violation (NOV)?
Where do I send my NOV response?
REVISIONS
Can I add a room or a unit to the Total Removal Amount of my J#?
Can I change the asbestos abatement contractor listed on my notification (J#)? How do I do that?
Can I change the location address on my J#?
Can I increase/decrease the Total Removal Amount on my J#?
Can my Demolition project be put on hold after it begins?
Page: (
Previous
)
1
2
3
4
(
Next
)
◄ Watch the Video Tutorial: Withdrawing an Asbestos Demolition Job Notification
Jump to...
Jump to...
Read More
Link: Air District Customer Portal
Watch the Video Tutorial: Creating a User Account
Download the Tutorial: Creating a User Account
Activity: Creating an Air District Customer Portal User Account
Read More About The Customer Portal Home Page
Watch the Video Tutorial: Saving an Asbestos Job Notification
Watch the Video Tutorial: Deleting an Asbestos Job Notification
Watch the Video Tutorial: Changing User Account Information
Watch the Video Tutorial: Changing the User Account Password
Watch the Video Tutorial: Creating an Asbestos Renovation Job Notification (10 business days)
Watch the Video Tutorial: Downloading an Acknowledgement Letter
Watch the Video Tutorial: Downloading an Invoice
Watch the Video Tutorial: Creating an Asbestos Renovation Job Notification (Emergency)
Watch the Video Tutorial: Creating an Asbestos Renovation Job Notification (Planned)
Watch the Video Tutorial: Creating an Asbestos Renovation Job Notification (Fast Track)
Watch the Video Tutorial: Creating an Asbestos Renovation Job Notification (Past or Current Job)
Watch the Video Tutorial: Revising an Asbestos Renovation Job Notification
Watch the Video Tutorial: Withdrawing an Asbestos Renovation Job Notification
Watch the Video Tutorial: Creating an Asbestos Demolition Job Notification (10 business day)
Watch the Video Tutorial: Creating an Asbestos Demolition Job Notification (Government Ordered)
Watch the Video Tutorial: Creating an Asbestos Demolition Job Notification (Fast Track)
Watch the Video Tutorial: Creating an Asbestos Demolition Job Notification (Past or Current Job)
Watch the Video Tutorial: Revising an Asbestos Demolition Job Notification
Watch the Video Tutorial: Withdrawing an Asbestos Demolition Job Notification
Watch the Video Tutorial: Session Expired Not Authorized
Watch the Video Tutorial: Session Expired Not Authorized ►
Asbestos Notification System
Introduction to the Online Asbestos Notification System
Access the Air District Customer Portal page
I. Creating an Air District Customer Portal User Account
II. Working with the Customer Portal
III. Asbestos Renovation Notifications
IV. Demolitions: Creating an Asbestos Demolition Job Notification
V. Troubleshooting
Home
Calendar